Durapac is a leading force in high pressure hydraulic tools that brings together decades of industry experience with a global manufacturing base to produce a complete range of quality industrial tools. At Durapac, they are serious about reliability, not just in our products but also in our people, distribution, stock holding & after sales service. For our customers this means a better quality of product. To supply safe, reliable tools with industry leading after sales back up & service underpinned by a comprehensive 3 year warranty.
The Problem:The customer required a simple and accurate method of applying the correct cla...
The Problem:A heavy vehicle alignment group customer that provides professional and engine...
A mining company contacted our technical sales team in Carlton, requesting a solution for ...
The Problem:This project was for a bridge launching system where 4 by RSLC-1504 Durapac cy...
The Solution:For this transformer change out four RG-258 Durapac 25 ton cylinders with sta...
Durapac’s RG-252 cylinder was used in conjunction with a P-2200 two speed hand pump and HP...
The Problem:A major busy city transport bus workshop had an issue with lifting up buses in...
The Problem:Forklift Service Company needed to lift forklifts of different sizes, shapes, ...
A Durapac RD-5013 Cylinder was used to assist in the removal and replacement of old pipes ...
Our customer had an assembly and disassembly bench used for the maintenance of hydraulic c...
At the abutment end of a road bridge, three bearings had to be replaced which supported th...
The SAFE-D-LOCK™ isn’t just for heavy vehicles, it can also lift trains and locomotives.Th...
The Problem:The client wanted a product to change dump truck tyres.The Solution:SAFE-D-LOC...
The supporting structural steel columns underneath a multi story building needed to be rep...
The client needed to remove the track frames from a Hitachi EX5500 Hydraulic Excavator - o...
Durapac’s Synchronous Lift System (SyncMaster) with its computer controlled monitoring sys...
This 67m long, 17m wide bridge’s abutments and piers had moved significantly during earthq...
This rail contractor had a requirement to assemble insulated track panels prior to the ins...
The Problem:A solution was needed at a mine site regarding the bolting application on the ...
A gold mine contractor need a safer way to breakout large 145mm hexagon nuts. The Durapac ...
The Problem:As part of its work to maintain a safe road network, the Tasmanian Department ...